๐Ÿ”ง Method Statement for the Supply & Installation of Plumbing Fixtures, Sanitary Wares & Accessories

๐Ÿ“Œ 1.0 Purpose โ€“ Ensuring Quality Installation of Sanitary Fixtures

This method statement is applicable for the supply and installation of plumbing fixtures, sanitary wares, and accessories as detailed in the approved drainage shop drawings.


๐Ÿ“ฆ 2.0 Scope โ€“ Complete Plumbing Fixture and Sanitary Ware Installation

Covers all activities related to supply, installation, and inspection of plumbing fixtures and sanitary accessories in line with project requirements and approved shop drawings.


๐Ÿ“š 3.0 References โ€“ Documents Guiding Installation Quality

  • Latest Approved Shop Drawings
  • Project Specifications
  • Project Quality Plan (PQP)
  • Project HSE Plan
  • Material Approval Request (MAR) for Sanitary Wares

๐Ÿ“– 4.0 Definitions โ€“ Abbreviations & Key Terms Explained

A comprehensive list of abbreviations such as PQP, PSP, HSE, ITP, WIR, MIR, MAR, UPVC, HDPE, and more.


๐Ÿ‘ท 5.0 Responsibilities โ€“ Team Roles in Sanitary Ware Installation

๐Ÿ”น 5.1 Project Manager

Focuses on project timelines, equipment readiness, and coordination with QA/QC and HSE teams.

๐Ÿ”น 5.2 Construction Manager

Manages daily site operations, approvals, and coordination with site teams.

๐Ÿ”น 5.3 Site Engineer

Implements drawings/specifications, oversees progress, coordinates inspections and safety.

๐Ÿ”น 5.4 QA/QC Engineer

Ensures compliance, raises WIR/MIRs, conducts inspections, and assists consultants.

๐Ÿ”น 5.5 Site Foreman

Manages labor and resource distribution while ensuring daily progress.

๐Ÿ”น 5.6 Safety Officer

Implements and monitors safety protocols, PPE usage, and safe access.

๐Ÿ”น 5.7 Store Keeper

Ensures proper material handling, safe storage, and coordination during delivery.


๐Ÿงฐ 6.0 Tools & Equipment โ€“ Essential Gear for Installation

Includes: Tool box, pipe wrench, measuring tape, spirit level, electric drill, solvent cement, welding machine (if required), and ladders.


๐Ÿ› ๏ธ 7.0 Installation Procedure โ€“ Step-by-Step Plumbing Installation Guide

โœ… 7.1 General Requirements

Approved materials, pre-installation inspection, and coordination with consultants.

๐Ÿšš 7.2 Material Transport & Delivery

Safe transport practices to avoid breakage or damage.

๐Ÿ—๏ธ 7.3 On-Site Storage

Proper storage conditions to avoid rust, exposure, or deformation.

๐Ÿ”ฉ 7.4 Installation Sequence โ€“ From Safety to Final Fix

โš ๏ธ 7.4.1 Safety Measures Before Installation

Toolbox talks, PPE usage, safety checks for chemicals, and trained workers.

๐Ÿ“ 7.4.2 Pre-Installation Checklist

Civil clearance, approved materials, proper wall openings, and leak-tested pipes.

๐Ÿ› 7.4.3 Installation Guidelines for Fixtures & Sanitary Wares

7.4.3.1 Plumbing Fixtures

  • Wall-hung and countertop installation
  • Flow control fittings
  • Stop valve and ball valve integration
  • Protective post-installation covering

7.4.3.2 Sanitary Wares & Accessories

  • Anchoring as per specifications
  • Anti-vandal and rust-resistant installation
  • Electrolysis isolation and protection
  • Final adjustments and safety checks

๐Ÿ’ง 8.0 Testing & Commissioning โ€“ Ensuring Leak-Free, Efficient Operation

๐Ÿงช 8.1 Pre-Commissioning Checklist

Ensure approvals, water pressure availability, and PRV settings.

๐Ÿ”Ž 8.2 Flow Rate & Performance Testing

  • Stopwatch testing of flow rates
  • Flush tank operation check
  • Automatic tap sensor response
  • Adjustment for non-compliant flow rates

๐Ÿ“Ž 9.0 Attachments โ€“ Supporting Documents for Quality Assurance

Risk Assessment

Quality Control Procedure (QCP)

Inspection & Test Plan (ITP)

Installation Check Sheets